I Want To . . .

About Us

Contact Information

Stormwater Management Program

Phone numbers:
(843) 719-4127 (Moncks Corner)
(843) 723-3800 ext. 4127 (Charleston)
(843) 567-3136 ext. 4127 (St. Stephen)

E-mail

Fax: (843) 719-4695

Office Hours:
8:00 AM - 4:00 PM
Monday - Friday

Location:
1003 Highway 52
Moncks Corner, SC 29461


Mailing address:
PO Box 6122
Moncks Corner, SC 29461

Contact Us 24/7

Related Links

Engineering Department | Stormwater

Post-Construction Stormwater Management:

Goal: Reduce pollutants in stormwater runoff from new development and redevelopment projects.


The Post-Construction Stormwater Management component is designed to provide Berkeley County the authority to require structural and non-structural stormwater quality best management practices (BMPs) on construction sites. The program holds owners responsible for the operation and maintenance of permanent BMPs through a legal document described as Covenants for Permanent Maintenance of Stormwater Systems. It also provides Berkeley County the authority to conduct post-construction site inspections and the ability to punish violators. The post-construction BMPs along with inspection and enforcement are expected to reduce siltation, turbidity, and other pollutants associated with developments.


Previous | Next
 
 
External Link External Link